No. | Section of the Information Memorandum | Clarification |
1 | Section 5.4.6 | The requirement on payment of spectrum application processing fees under Section 5.4.6 of the information memorandum has been waved.
|
2 | Section 2.1.1
/Table-1 |
The total amount of spectrum in the 2600MHz in FDD is 20MHz (2x10MHz).
|
3 | Section 2.2.1 | ii) The consideration of total spectrum holding of 220MHz in 2300MHz, 2600MHz, 3300MHz, and 3500MHz bands includes existing spectrum holdings prior to this process and applies to both TDD and FDD portions. |
iii)In the 2600MHz band, applicants can only apply for spectrum in either the TDD or FDD portion of the band but not both. | ||
4 | Section 9.1/
|
The link for submission of the application is https://www.ucc.co.ug/apps-portals/ |
5 | Section 7.1.3
Evaluation of the coverage, performance, and affordability commitments |
Section 3.4 highlights the specific mandatory obligations associated with the respective spectrum ranges and section 6.1, the minimum requirements associated with the multiband spectrum award process.
However, the highest evaluation scores in respect of the aspect (coverage, quality of service, affordability, technology adoption) and timelines in which that commitment is planned to be fulfilled, shall be achieved by the commitments that best delivers to or as per desired targets highlighted in table 3 under section 7.1.3.
The spectrum may be used to provide mobile internet services or Fixed wireless Access. The commitment to be made in respect of either or both shall be evaluated using table 3. |